A crane lowers a finished NOOK 10 into a private home at night.

The NOOK process · Configure to installed

From your screen to your plot, without years of building work

Configure it, we build it in 8-12 weeks, and a NOOK 10, 20 or Sauna is connected in a few hours. Zenith is assembled on site in about two weeks; for Etna those two weeks cover the structure and exterior, and the interior is designed and quoted with you.

How it works

In the factory. Your NOOK 10, 20 or Sauna leaves finished inside and out.

A NOOK 10, 20 or Sauna arrives finished and is connected in a few hours. Zenith: about two weeks of on-site assembly. Etna: structure and exterior in about two weeks; the interior is designed and quoted with you.

Of concrete poured. Reversible screw piles instead.

The difference

A building site, or a delivery

A traditional build

Months of trades, deliveries and unfinished work in your garden
Skips dust, deliveries and trades in and out for months
Open-ended a changing quote leaves the final cost uncertain until the end
Poured concrete footings — permanent, and yours to remove

A NOOK

8–12 weeks in the factory — your garden untouched
Hours on site for a NOOK 10, 20 or Sauna, from crane to keys
Agreed ex-works price, agreed before we manufacture
Piles a steel frame on screw piles — no concrete, fully reversible

Built like a building, engineered to leave — never a shed. For operators: add keys at the edge of the property while the rooms you already have stay open.

The assembly line for the NOOK 10, 20 and Sauna

Six phases for a NOOK 10, 20 or Sauna: 8-12 weeks in the factory, a few hours in your garden

Reserve

Refundable reservation. Your production slot is held.

Validate

A feasibility study of your site and a technical validation before we build.

Build

Built at our nearest production base, in Spain or Florida.

Foundation

Screw piles, ~2 weeks before delivery. No concrete, fully reversible.

Deliver

1–2 days by road from the factory to your gate.

Installed

Craned onto its piles and connected in a few hours. Crane to keys.

Planning permission is the customer’s responsibility — we provide the full technical dossier of drawings, specifications and certificates.

What the price includes

What we handle — and what your site needs from you

We handle

Structure & steel frame
Screw-pile foundation
Transport to site
Crane placement
Installation
Electrical pre-wiring
Double glazing with argon
Technical dossier of drawings and specifications

You bring

A garden with crane access
The final mains connection — a local tradesperson, a few hours
Your local planning check — with our full technical dossier in hand.

One ex-works price, agreed before production. Transport, foundations and installation are quoted per address.

See live pricing in the configurator

Build and warranty

Built to last. A NOOK can also be relocated

Steel

A welded steel frame under every module.

Argon

Double glazing with argon; insulated walls, roof and floor.

All year

Heating and cooling, for use in every season.

NOOK 10, 20 and Sauna: 3 years on residential units; for hospitality, warranties adapted to each project.

Thermo-treated

Thermally modified timber cladding, durability class 2 (EN 350).

Reversible

A NOOK 10, 20 or Sauna can be dismantled and relocated; the piles leave the ground as it was.

Spain and Florida.

No concrete

Screw piles leave the ground as you found it.

Notes

Frequently asked questions

How long does the whole process take for a NOOK prefab garden room?

It is built in 8–12 weeks, arrives finished and is connected in hours.

Before that come your idea, the check of your site and your proposal with floor plans; where planning consent is needed, that comes first, and we tell you what to expect before you order. For Zenith and Etna, on-site assembly takes about two weeks; for Etna that covers the structure and exterior, and the interior is designed and quoted with you.

How much does it cost to reserve a prefab garden room, and is it refundable?

€2,000 for a NOOK 10 or NOOK Sauna and €5,000 for a NOOK 20 (or the equivalent in pounds or dollars), refundable if your site turns out to be unviable.

You then complete 30% to secure your production slot, and pay the remaining 70% when production starts. Hospitality projects pay in stages.

Who handles planning permission for a prefab garden room?

We look at it with you before you commit to anything: whether you need consent depends on where you are and how you'll use it.

Where it is needed, it comes first, before production. On hospitality projects we work with your architect and planners, and we work through it with you.

What does the price of a NOOK include, and what is quoted separately?

The price is for the finished unit, ex works, excluding VAT.

Transport, foundations and installation are quoted for your address, and we organise all three. For Zenith, transport, foundations, assembly and taxes are quoted separately; for Etna they are quoted and coordinated with your builder.

How do you check whether my site suits a prefab garden room?

Send us a few photos and we'll tell you what's possible: access for the truck and crane, where the power and water are, orientation, trees and local planning.

Your reservation is refundable if your site turns out to be unviable.

What happens on the day your NOOK arrives?

Your NOOK arrives finished, the crane sets it on its foundations and it is connected in hours.

Foundations are done beforehand, on a separate visit: screw piles, your existing level concrete base or concrete pads. And we're still here once it's yours.

Can a NOOK prefab garden room be moved later?

Yes. A NOOK sits on screw piles rather than permanent foundations, and can be lifted out and moved.

Zenith and Etna, by contrast, are permanent houses built on site.

What guarantee comes with a NOOK prefab garden room?

A 3-year guarantee on residential units, plus each component's own manufacturer warranty. Hospitality guarantees are tailored to each project.

Every detail is finished before it leaves our production base, so it still looks new in ten years' time.

Start the conversation

Your space starts with a conversation

Thirty minutes, no obligation — for homeowners, landowners and hospitality operators alike.